Our Airport projects
Domedoeva Terminal 2
Asbuilt Documents and Design control
Project period > 2017-2018
ANNA GULENOK
Chief Designer - BIM Team of MYCEM JSC
Architectural design and Mep scope
Pulkova International Terminal 2
Contractor > ICTAS - ASTALDI JV
Subcontractor > OAO MYCEM - St Petersburg -Russia
Project period > 2014-2015
The HVAC commissioning work at the airport terminal involves the thorough inspection and testing of the heating, ventilation, and air conditioning systems. This crucial process ensures that the HVAC systems are functioning efficiently and effectively to provide optimal comfort and air quality for passengers and staff. The commissioning team will meticulously check the equipment, controls, and overall system performance to identify any issues or necessary adjustments. They will verify that the airflow, temperature, humidity, and air distribution meet the specified requirements. Additionally, they will assess the system's energy efficiency, safety measures, and compliance with regulatory standards. After completing the commissioning work, the HVAC systems will be fully operational, ensuring a pleasant and comfortable environment within the airport terminal.
İstanbul Grand Airport (İGA)
Design scope and documentation
Project period : 2016-2017
Project duration : 46 months
Total construction area : 3.500.000 m2
Terminal building 1.300.000 m2
sub service buildings 1.500.000 m2
Carpark area 700.000 m2
Total 3.500.000 m2
HVAC Duct, HVAC Pipe, Plumbing ve Fire Fighting systems
Revit program and 3D Coordination - SDR - Shopdrawing - Asbuilt
Revit - 3D - BIM / Mechanical scope
Design & Coordination / Mechanical Equipments